Villa Anandam Specification

Structure:

  • Earth Quake Resistant Structure.
  • Wall Finish

  • Internal: Plaster, P.O.P. & Acrylic OBD in pastel colour. Ceiling White OBD. P.O.P. cornice in Drawing/Dining and all Bed Rooms.
  • External: Texture paint.
  • Flooring

  • Drg. / Din.: Vitrified Tiles.
  • Bed Rooms: Vitrified Tiles / Laminated Wood.
  • Balconies: Ceramic Tiles.
  • Staircase: Green Marble/Jaiselmer or equivalent.
  • Toilets

  • Walls: Ceramic Tiles upto 7' height.
  • Flooring: Ceramic Tiles.
  • Fittings: Hot & Cold water supply line. CP Fittings of standard make. Mirror. Towel Rail. Bath tub in master toilet.
  • Sanitary ware: White/Pastel Colour Vitreous Ceramic Sanitary ware of Standard make.
  • Kitchen

  • Platform: Black Granite with Stainless Steel Kitchen Sink.
  • Wall: 2' Ceramic Tile dado above Platform.
  • Flooring: Ceramic / Vitrified Tile.
  • Fittings: Hot & Cold water supply line with CP fitting of standard make.
  • Cabinets: Modular Kitchen Cabinet above and below the counter.
  • Windows: UPVC / Powder coated Aluminium Window frames & shutters with glazing. MS Grills shall be provided in windows. Provision for fixing mosquito net shutter shall be provided in windows.
  • Doors

  • Internal: Moulded Skin Door Shutters Polished / Painted in 2 coats of Synthetic
  • Enamel Paint. Door Frames in Hard Wood / Aluminium duly painted.
  • External: Moulded Skin Door Shutter duly painted / Aluminium Shutters with Powder Coated Aluminium Frame.
  • Main Door: Teak Wood Frame with Moulded Skin Door Shutter duly polished.
  • Electrical

  • Copper wiring in concealed PVC Conduits. Modular Switches of standard Make. TV & Telephone points in each bedroom & Drawing/Dining. One Video Door Phone shall be provided in each villa.
  • Water Supply

  • Water supply through borewell. Overhead water tank shall be provided in each Villa.
  • Power Back-up

  • Internal: Power Back-up of 3 KW shall be provided either through individual Inverter or through central generator as decided by the Company*. In case of centralized generator, monthly running cost of the back-up power shall be payable extra.
  • External Services within Complex: DG Set of suitable capacity for external colony lighting & Services shall be provided. Running cost shall be payable extra on monthly basis.